W z X0F DX z x0max DT dtdx max z T0 DX dtdt maxz t0vx DT Max z t0at DT 12ma2xt 2. Then G GM R2D R where is the straight line distance from the ore-viewfinder to the middle of the hole and M is massof material that would fill the hole. This kind of accuracy with respect to 2572 km is1013 2572 mi 1609 M1 mi 413 NM. The 3e1-15 volume of Antarctica is rounded off the area of the base time height The area of the foundation is the area of a semicircle. Neither M nor R Medi the final equation. 11 E10-1 L RP MVR 13.7103 kg 30ms 0.12 m 0.62 kg M2S. The liquid outputs on C and assuming that it is still in contact with the walls of the pipe pressure dierence is provided by P H1 D H2 so that thepressure on B is P P0 H1 D H2. c The lowest possible pressure at B is zero. W Z x0F dx Z x0max dt dtdx max Z t0 dx dtdt maxZ t0vx dt max Z t0at dt 12ma2xt 2.Then g GM r2d r where r is the straight line distance from the prospector to the center of the hole and M is the massof material that would fill the hole.This kindof accuracy with respect to 2572 miles is1013 2572 mi 1609 m1 mi 413 nm.3E1-15 The volume of Antarctica is approximated by the area of the base time the height thearea of the base is the area of a semicircle.Neither M nor R enteredinto the final equation. 11 E10-1 l rp mvr 13.7103kg 30ms 0.12m 0.62 kg m2s.The fluid exits at C and assuming that it remains incontact with the walls of the tube the pressure dierence is given by p h1 d h2 so thepressure at B is p p0 h1 d h2. c The lowest possible pressure at B is zero.